Connecting to a sewer

anycast加速器最新版-outline

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

anycast加速器最新版-outline

anycast加速器最新版-outline

老佛爷加速器,老佛爷vp加速器,老佛爷vp加速器官网,  雷公马最新版,雷公马下载地址,雷公马官方网址,雷公马永久免费加速  vqn免费加速器,极光vp加速器官网,免费vqn加速2024,酷通vqn永久免费版  美国加速器最新版,美国加速器安卓下载,美国加速器vqn,美国加速器vnp  番茄加速器vqn,番茄加速器免费永久加速,番茄加速器打不开,番茄加速器vp  科学上网软件官网网址,科学上网软件永久免费加速,科学上网软件打不开,科学上网软件vp  蚯蚓加速器免费试用,蚯蚓加速器2024,蚯蚓加速器vp,蚯蚓加速器vps  蜂鸟加速器破解版,蜂鸟加速器下载地址,蜂鸟加速器电脑版下载,蜂鸟加速器2024